A control chart serves two purposes that are easy to confuse, and
confusing them is the most common cause of misleading charts in
practice. Woodall (2000) crystallised the distinction:

- **Phase I** is *retrospective*. You have a body of historical data
  and want to *establish* trustworthy control limits. The natural
  workflow is iterative: look for out-of-control points, investigate
  whether they have assignable causes, remove those points if so, and
  recompute the limits. The output of Phase I is a chart whose limits
  are believable — points outside them are genuinely surprising.
- **Phase II** is *prospective*. You take Phase I's limits as fixed
  and apply them to *new* data, signalling alarms when something
  departs from the established baseline.

Most R packages collapse the two into a single function call, which
has two consequences. First, every "monitoring" run silently
re-estimates the limits, so a real shift that grows over time can
update the limits along with itself and never alarm. Second, the
diagnostic table for Phase II shouldn't contain "this baseline
itself violates the rules" entries — but it always does in tools
that don't separate the phases.

`shewhartr` keeps the two distinct in code through `calibrate()` and
`monitor()`.

## A worked example

`bottle_fill` has 100 observations. Imagine the first 60 are our
historical baseline, gathered while the process was thought to be in
control, and the next 40 are new data we want to monitor.

```{r}
baseline <- bottle_fill[1:60, ]
new_obs  <- bottle_fill[61:100, ]
```

### Phase I: calibration

```{r}
calib <- calibrate(
  baseline,
  value         = ml,
  index         = observation,
  chart         = "i_mr",
  trim_outliers = TRUE
)
calib
```

`trim_outliers = TRUE` enables iterative trimming: any observation
that violates the rules is removed and the limits are recomputed.
The procedure is described in Montgomery (2019), Section 6.2.3.

```{r}
calib$phase
calib$n          # potentially less than nrow(baseline) if trimming dropped points
broom::tidy(calib)
```

### Phase II: monitoring

```{r}
alarms <- monitor(new_obs, calib)
alarms$phase
alarms$violations
```

`monitor()` does *not* re-estimate the limits. It propagates the
calibrated limits to the new data, applies the same rule set, and
returns a fresh chart object whose `phase` slot is `"phase_2"`.

You can plot the monitored series exactly the same way:

```{r, eval = FALSE}
autoplot(alarms)
```

## Why the trim step matters

Suppose your baseline contains a single contaminated observation —
say, the time the operator forgot to recalibrate the scale. If you
include it, the moving range will be inflated, sigma will be
overestimated, and *future* alarms will be too lenient. The trim
step iteratively removes such contamination from the calibration
data.

You can disable trimming if you don't trust automatic outlier
removal:

```{r}
calib_no_trim <- calibrate(baseline, value = ml,
                           chart = "i_mr",
                           trim_outliers = FALSE)
calib_no_trim$sigma_hat
calib$sigma_hat       # potentially smaller after trimming
```

The general principle (Tukey 1977): an analyst should look at the
data before trusting any automated calibration. Use
`shewhart_diagnostics()` and the runs-violation table to interrogate
your baseline before declaring it "in control".

## When this matters most

The Phase I / Phase II distinction is most consequential when:

- The process has evolved (operators, materials, environment) since
  the historical baseline was collected. Limits estimated on the old
  data may misfit new operating conditions.
- A small sustained shift is present. Re-estimating limits each
  monitoring run masks slow drifts.
- You will compare different time periods. Without fixed limits, a
  comparison is between two estimates rather than against a single
  reference.

## References

- Woodall, W. H. (2000). Controversies and Contradictions in
  Statistical Process Control. *Journal of Quality Technology*,
  32(4), 341-350. \doi{10.1080/00224065.2000.11980013}
- Montgomery, D. C. (2019). *Introduction to Statistical Quality
  Control* (8th ed.). Wiley. Section 6.2.3.
- Champ, C. W., & Woodall, W. H. (1987). Exact Results for Shewhart
  Control Charts with Supplementary Runs Rules. *Technometrics*,
  29(4), 393-399.
- Tukey, J. W. (1977). *Exploratory Data Analysis*. Addison-Wesley.